Challenges
Collins Construction Ltd secured the £12m contract to deliver 20 Berkeley Square, an office development in the heart of Mayfair. With an ambitious design vision, it was critical to ensure the architecture was accurately realised throughout construction.
Solution
Able Partners were appointed as a collaborative design partner, working closely alongside Collins Construction throughout the construction phase. By integrating with the contractor team, we helped develop and coordinate the design in detail, ensuring buildability, cost certainty and programme alignment while faithfully delivering the original design intent.
Client
Collins Construction Ltd













